Byro Power Plant

The Byro River is located between Måge and Reisete in Ullensvang Municipality. The river serves as the border between Måge and Lindvik. Landowners were aware that the river possessed potential for small-scale hydropower. How the value creation from the river should be realized was the subject of negotiations with several developers.

The story

The Byro River is located between Måge and Reisete in Ullensvang Municipality. The river serves as the border between Måge and Lindvik. Landowners were aware that the river possessed potential for small-scale hydropower. How the value creation from the river should be realized was the subject of negotiations with several developers.

In 2008, a contract was signed with Småkraft, which assumed the risk and undertook the licensing process and the construction itself. The Norwegian Water Resources and Energy Directorate (NVE) granted the license in 2012, which was confirmed by the Ministry of Petroleum and Energy (OED) following an appeal in 2013. In the summer of 2014, the contractors arrived with their machinery. By 2016, the power plant was ready to deliver its contribution in the form of new renewable energy and local business income.

Byro Power Plant now stands neatly integrated into the terrain by the main road.

The project

The implementation of the project faced various challenges along the way. The name Byro means ‘flour chest’ and originates from repeated winter avalanches (where the drifting snow resembles flour smoke rising from the gorge).

When standing at the intake looking down the gorge, it is easy to understand why nothing has been built here previously. The intake had to be constructed without road access, and the vast majority of the contractor work at the intake was performed using traditional methods, with access via ladders.

On the positive side, the local contractor and other suppliers maintained steady progress. The borehole hit the mark perfectly at the intake, and the work on the intake threshold itself benefited from relatively favorable weather conditions. This, combined with an operational project team and construction management, ensured that the project was completed according to plan.

Collaboration with the landowners has been excellent. Their contributions, in the form of local knowledge and presence during both the application and construction phases, contributed to successful project execution.

Technical data

Rainfall field

2,9 km²

Minimum water flow

Summer: 75 l/s
Winter: 5 l/s

Intake elevation

498,5 m

Power station elevation

14,0 m

Drop height

484,5 m

Production

9,4 GWh
This corresponds to electricity for 588 households.