The power plant is planned to be located in Vik municipality, situated in Western Norway. Construction is scheduled for completion in 2027.
Reinforced and Formed Wall for Spillway, August 2026
Reinforced and Formed Wall for Spillway, August 2026
Tunnel, march 2026
Tunnel, march 2026
Visualization from the outside
Visualization
The power plant is designed to harness the fall in Eitreelvi between elevation 560 and 20 meters above sea level. The normal annual production is estimated to be approximately 12 GWh.
The power plant is planned to be situated in a mountain hall, where only the facade’s front will be visible from the outside (see images).
Technical data
Rainfall field
7,2 km²
Minimum water flow
Summer: 100 l/s
Winter: 25 l/s
Intake elevation
–
Power station elevation
–
Drop height
–
Production
12,0 GWh
This corresponds to electricity for 750 households.