Hammerstrand Power Plant

The power plant is located in Buvika in Skaun municipality in Sør-Trøndelag. Norsk Grønnkraft AS acquired the power plant from Cermaq in the summer of 2004.

Hammerstrand Power Plant has three dams:

Nydammen: Built circa 1918. The dam height is approximately 13 meters and it is 116 m long. Nydammen holds approximately 550,000 m³ of water.

Sætervannet: Built in the early 1900s. The dam height is approximately 7 meters and it is approximately 38 meters long. Sætervannet holds approximately 500,000 m³ of water.

Djupsjøen: Built in the early 1900s. The height of this dam is approximately 10 meters and it is 60 meters long. Djupsjøen holds, in addition to the occasional trout, approximately 2,200,000 m³ of water.

During the summer of 2012, significant improvements are being carried out on all dams associated with Hammerstrand Power Plant.

The penstock was built in 1928. Originally with riveted steel pipes. Today it consists of fiberglass, PVC, and steel. The pipe diameter is 60 cm. The penstock is 2.2 km long with a head of 176 meters. This means there is a water pressure of approximately 17.6 bar at the power station.

At full production, Hammerstrand Power Plant uses 0.6 m³ of water per second. The power plant requires 3.3 m³ of water to produce 1 kWh.

Technical data

Rainfall field

–

Minimum water flow

–

Intake elevation

178,0 m

Power station elevation

3,0 m

Drop height

175,0 m

Production

2,2 GWh
This corresponds to electricity for 138 households.