Skip to content
Services
Construction
Operation and service
Power sales
Financing
Sustainability
Power plants
Power plants – active
Power plants – under construction
Latest news
About us
About Småkraft
Company information
Contact us
Services
Construction
Operation and service
Power sales
Financing
Sustainability
Power plants
Power plants – active
Power plants – under construction
Latest news
About us
About Småkraft
Company information
Contact us
Search
Under development
Lisjvasselva power plant
Lisjvasselva power plant is being built in Sørfold municipality, located in Nordland.
The intake is beautifully located at the outlet of Lisjvatnet, April 2026
Turbine installation, November 2025.
Turbine installation, November 2025.
Turbine installation, November 2025.
Turbine installation, November 2025.
Generator installed, October 2025.
Plastic lining of intake and dam underway, June 2025.
Concrete work completed, May 2025
April 2025: Construction work resumes after winter shutdown
Beginning of pipe trench excavation and drilling, April 2024
Illustration of Lisjvasselva Hydropower Plant. Design: L Consulting As
Illustration of Lisjvasselva Hydropower Plant. Design: L Consulting As
Illustration of Lisjvasselva Hydropower Plant. Design: L Consulting As
Illustration of Lisjvasselva Hydropower Plant. Design: L Consulting As
Illustration of Lisjvasselva Hydropower Plant. Design: L Consulting As
Technical data
Rainfall field
–
Minimum water flow
Summer: 200 l/s
Winter: 100 l/s
Intake elevation
–
Power station elevation
–
Drop height
–
Production
–