Øyrabekken power plant is located in Hesvik, in Ullenvang municipality, and has its outflow into the Hardangerfjord. In Hesvik, they have utilized hydropower for hundreds of years for mills, stamp mills for fulling clothes, sawmills, and since the interwar period, their own electricity.

Magne Eikenes has a farm that produces its own power from a small brook to this day. This power plant, from 1956, provides direct current for lighting and heat, and also has power take-off via belt drive for a saw.

In order to utilize the far larger Øyrabekken river, landowners Håkon Jensen and Magne Eikenes chose a partnership with Småkraft AS in 2003. The power plant was granted a license in 2005, and with construction starting in April 2006, the construction time was just under 1 year.

Øyrabekken power plant was officially opened on 11 April 2007, in the presence of the landowners, workers, mayor, and invited guests.

Experience from 2 years of operating the plant is good. Collaboration between Småkraft and landowners on operations has proven to be an efficient and quick way to solve problems that arise, especially with the proximity for inspections and start-ups. The plant has had highly stable operations, with only a few minor “teething troubles” at the start.

The waterway is located in a somewhat challenging terrain, which resulted in a penstock with untraditional solutions. In the sparse terrain at the top, the pipe is clamped to the rock; further past a vertical rock face, there is a prefabricated pipe bolted to the rock. The bottom part is buried. Collaboration with the local contractor has been excellent. Similarly, framework agreements with equipment suppliers have also yielded both good and cost-effective results.

One of the most important factors for the successful implementation is a constructive collaboration between landowners and Småkraft. Another essential success factor is that challenges that arose along the way were solved constructively and continuously, without resorting to bureaucratic processes. Construction was able to maintain the schedule and budget. This is not a given in this type of project.

The Pelton turbine has 4 jets with a maximum discharge capacity of 0.82 m3/sec and drives a 2300 kVA, 6600 V generator. The GRP/cast iron penstock with a 0.6-meter diameter is 800m long and is partially buried.

All electricity is transformed up to 22 kV and delivered to the grid. The intake dam is built as a gravity dam in reinforced concrete with a rack and sliding gate. The 65m2 power station building is designed with a glass wall, stone walls, and paneling to provide an aesthetically pleasing impression in addition to being practically functional.

Technical data

Rainfall field

5,9 km²

Minimum water flow

Summer: 60 l/s
Winter: 30 l/s

Intake elevation

305,0 m

Power station elevation

10,0 m

Drop height

295,0 m

Production

7,3 GWh
This corresponds to electricity for 456 households.