Sanddal power plant is located in Jølster municipality, in Vestland county.
Sanddal power plant
The power plant utilizes a drop of 170 meters and has an installed capacity of 2.42 MW. The waterway consists of a buried pipe gate on the west side of the river. Annual power production is estimated at around 10 GWh, and the license was granted in 2006.
Technical data
Rainfall field
–
Minimum water flow
Summer: 70 l/s
Winter: 70 l/s
Intake elevation
–
Power station elevation
–
Drop height
–
Production
9,4 GWh
This corresponds to electricity for 588 households.