The Tveitaskar power plant is located in Hålandsdalen in Fusa municipality. It is an especially grand and solidly built facility that produces environmentally friendly, renewable energy.
With the Tveitaskar power plant in operation, the farms in the Tveita area can continue their tradition of creating alternative sources of income in addition to agriculture. A broader income base is important for strengthening the foundation for maintaining settlements in the village.
Long ago, Tveita consisted of a farm, which was eventually divided into two, and later three farms. The farms at Tveita have traditionally made their living from livestock over several generations, and this is still the case at Bjarte Skjelvan’s farm. In the post-war period, a transport company was established, which was in operation for several decades. Earlier, Tveita had its own slate quarry. Slate from Tveita is distinctively white, which has left its mark on the houses in the area. The river has also supplied energy to a local mill house at Tveita, which has benefited all the farms in the area.
Access to the rest of the world has not always been simple for the people of Tveita. Traditional animal husbandry and goods such as butter and cheese were either transported over the mountain to Strandebarm, or by rowing boat across Skogseidvannet lake and down to Sævereid. After the road came, the valley was given a more natural connection to Fusa. Earlier, Tveita was part of Hålandsdalen municipality, which in 1964 became part of Fusa municipality.
Several rivers flow down to Tveita. The Tveitaskaret power plant utilizes the head in one of them – Skarelva. The rivers are part of everyday life for the farms at Tveita, which on several occasions have been subjected to major floods. In the late 1970s and in 2007, extensive work was done to limit the extent of damaging floods. This work was carried out under the direction of NVE. In conjunction with the establishment of the power plant, a road has now been built up into the valley, providing easier access to outlying fields and the mountains.
Through the joint efforts of the landowners and Småkraft, a new era has arrived at Tveita. Good planning and excellent cooperation have resulted in a power plant that brings optimism and faith in the future.
The power plant began trial operations in the autumn of 2009 and was officially opened on August 31, 2010, by Solveig Tveita Skjelvan, the eldest generation from the Tveita farm.
The Tveitaskaret power plant is part of the Sævereid watercourse and has a catchment area of 5.4 km2. The intake is located at an elevation of 400 meters and the station is located at 90 meters, providing a head of 310 meters. The route is approximately 1,750 meters long. The power plant has an installed capacity of 4.2 MW with a discharge capacity of 1.55 cubic meters/sec. The minimum flow requirement is 50 l/sec. A Pelton turbine has been installed, and the waterway consists of 700 mm ductile iron pipes buried in a trench. The power station is constructed in accordance with Småkraft’s aesthetic guidelines. The station is built above ground and adapted to the area. The power plant has an expected average annual production of 10 GWh. This corresponds to the annual electricity consumption of approximately 500 households.